A rear extension can sometimes be built without a full planning application, but that does not always mean you can simply begin work. A common question from homeowners is: when is prior approval needed? The answer depends on the type of development, your property’s location and the permitted development rules that apply to it.
Prior approval is a formal process run by your local planning authority. It sits between doing nothing and submitting a full planning application. It is designed to allow certain development under permitted development rights, while giving the council an opportunity to consider specific effects of the proposal, such as its impact on neighbours, appearance, transport or flooding.
For homeowners, it is most often relevant to larger extensions and certain forms of upward extension. Getting the route right early helps avoid delays, redesign costs and uncertainty once builders are ready to start.
What prior approval means in practice
Permitted development rights allow some work to be carried out without full planning permission, provided it meets detailed national limits and conditions. Prior approval is required where those rights are subject to an additional check by the council.
This is not the same as planning permission. A full planning application considers the proposal more broadly against local and national planning policies. With prior approval, the council is considering a defined set of matters set out in the legislation. However, the application still needs accurate drawings, clear information and careful checking before submission.
The council may decide that prior approval is not required, grant prior approval, grant it with conditions where appropriate, or refuse it. Work should not begin until the correct written decision has been received or the relevant statutory period has passed without a decision.
When is prior approval needed for home extensions?
The situation most homeowners encounter is a larger single-storey rear extension. Under the larger home extension provisions, some houses may be able to extend beyond the usual permitted development depth limits. Before work starts, though, the proposal must go through the neighbour consultation scheme.
The local authority will notify adjoining occupiers, who have an opportunity to comment. If objections are received, the council will assess whether the extension would cause unacceptable harm to neighbouring amenity. This commonly includes looking at loss of light, outlook and whether the scale of the extension would feel overbearing.
Even where no neighbour objects, the proposal must still comply with the relevant permitted development conditions. The extension’s height, materials, position and relationship to boundaries all matter. A seemingly modest change to a roof form or external finish can take a scheme outside permitted development rights.
This is why it is unwise to rely on a neighbour’s informal agreement alone. Neighbours may be supportive, but the legal planning route still needs to be followed.
Upward extensions may also need approval
Some properties can use permitted development rights to add additional storeys, but these rights are more restricted than many people expect. They apply only to particular building types and are subject to detailed limitations.
Prior approval is normally part of this process. The council may assess matters including the building’s external appearance, overlooking, privacy, daylight and sunlight, the impact on neighbouring buildings, and the effect on the character of the area. It may also consider practical issues such as access, waste storage and the impact on protected views where relevant.
Upward extensions can create valuable living space, but they require careful design from the outset. A proposal that works well on paper must also sit comfortably with the existing building and its surroundings.
Projects that often need a different route
Not every project that avoids a full planning application needs prior approval. Many straightforward loft conversions, modest rear extensions, internal alterations and garden buildings can fall within permitted development without prior approval, provided every relevant condition is met.
Conversely, some projects need full planning permission from the start. This may be the case for extensions that exceed permitted development limits, proposals to alter the front of a property in a restricted way, new homes, or works that do not meet the terms of the relevant permitted development class.
Changes of use can also involve prior approval, particularly where commercial buildings are being converted to residential use. That is a different process from a typical house extension and requires its own assessment of the building, its lawful use and the local planning position.
The key point is that permitted development is not a single permission that covers every improvement. Each project must be assessed on its own facts.
Check whether your permitted development rights apply
Before deciding that prior approval is the right route, it is essential to establish whether permitted development rights are available at all. They may be restricted or removed in certain circumstances.
Listed buildings do not benefit from permitted development rights in the usual way, and works affecting them may require specific consent. Properties in conservation areas, Areas of Outstanding Natural Beauty and other designated locations are also subject to tighter rules. In some streets, an Article 4 Direction may remove particular permitted development rights altogether.
Previous planning permissions can matter too. Conditions attached to an earlier consent may limit future alterations, and the planning history of the property can affect what has already been used from its permitted development allowance.
For homes in Surrey and Sussex, local character can be a significant consideration. A rear extension that is unlikely to affect the street scene may be relatively straightforward, while a visible roof alteration or additional storey can need much more careful thought.
What your council will want to see
Prior approval applications are often less extensive than a full planning application, but the information still needs to be clear and complete. Poorly prepared submissions can lead to requests for further details or delays while the council decides whether it has enough information to validate the application.
A typical submission will include scaled existing and proposed drawings, a site location plan, a block plan and a description of the proposal. Depending on the development, elevations, sections, photographs and supporting statements may be needed to explain the likely effect on neighbours or the wider area.
For larger rear extensions, accurate plans are particularly valuable. They allow the council and adjoining occupiers to understand the depth, height and position of the extension without relying on assumptions. They also give your builder a much clearer basis for pricing and construction.
Prior approval is not building regulations approval
Planning and building control are separate processes. Prior approval addresses whether a proposal can proceed under the relevant planning rules. Building regulations deal with how the work is designed and constructed, including matters such as thermal performance, fire safety, drainage and safe access.
A project may receive a favourable prior approval decision and still need detailed building regulations drawings before construction begins. For extensions and loft conversions, early coordination between the planning drawings and the technical package reduces the risk of changing the design later to meet building control requirements.
It is also sensible to allow for the practical realities of the build. A design should not only satisfy the planning route. It should make good use of the space, work with the existing house and be capable of being built efficiently.
A sensible first step before applying
The best starting point is a feasibility review of the property and your aims. This should consider the existing building, planning constraints, the scale of space you need and whether a permitted development route, prior approval or full planning application is most appropriate.
For a larger rear extension, it may be sensible to compare a permitted development scheme with a slightly more ambitious planning-led option. The former can be more predictable where the limits are clearly met; the latter may offer a better layout, improved daylight or a design that suits family life more effectively. There is no single right answer.
At Adamson Architecture & Planning, we help homeowners turn an initial idea into a clear route forward, from measured drawings and design options through planning or prior approval submissions, building control information and construction-stage support. A free, no-obligation consultation can clarify what is realistic before you commit to a particular design or programme.
If you are considering an extension, loft conversion or major alteration, do not treat prior approval as a formality. A well-prepared scheme gives you a stronger foundation for the decisions that follow and more confidence as your home starts to take shape.